How do I waterproof my render?

Step 1: Wet the wall with water. Step 2: Prime the wet wall with a mixture, consisting of, 4 in 1, which has been diluted in the ratio of 1:1 with water and added to cement until a creamy consistancy has been reached. Step 3: Render on two 6mm coats of cement and sand, which has been mixed in the proportions of, 1 part cement and 2 parts dry sharp sand by volume, and has been mixed with a liquor consisting of 1 part 4 in 1, and 1 part water. Step 4: This mixture is then trowled onto the wet or tacky primer which is protected from premature drying, by covering with polythene sheet.
         


Click here to request your FREE COPY of our indispensible guide to construction chemicals.

Adawall newsletter

Stay informed on our latest news!